You decide at what amount you want to be alerted. You will receive a low balance notice by e-mail, phone, or text message. Would it be easier for you to make a smaller payment more often rather than one large payment each month? If so, Advance Pay may be for you.Īre you interested in monitoring your electricity usage? Statistics indicate prepay electricity programs help lower electric consumption due to member awareness of usage patterns. Advance Pay members never pay a late charge or reconnect fee. Instead of receiving a paper bill each month, usage is calculated daily. Wooden backboard must be large enough to extend 4” minimum beyond all enclosures in every direction.Need to update your information and select your alert preferences?Ĭlick here for our convenient, online form.Īdvance Pay is a pay-as-you-go plan that allows you to pay when you want, in the amounts you want. Maximum temporary recommended is 100 AMP. Temporary Service Pole: If we provide a temporary service pole, there will be a $25.00 monthly rental fee until the temporary service pole is returned. All entrance must have conduit, mast and weatherhead.Īn extra disconnect is recommended if meter base and disconnect box are not back to back in a common wall (mandatory in Ben Hill, Irwin, and Turner Counties Tift and Berrien Counties require if distance of cable between is greater than 8’ Turner County recommends in every case). Underground must be a minimum of 24 inches deep (it is recommended to be in conduit). The conductor shall have no splices and be connected directly to the grounding lugs of both the meter base and disconnect box. Two 5/8-inch x 8 feet copper or copper clad grounding electrodes must be supplied with a #4 copper or larger grounding conductor spaced a minimum of 6 feet apart. REQUIRED MINIMUM SIZE OF ENTRANCE CABLE IN MAST AND METER BASE DCA) or when service is located other than on the exterior wall of the building served 30 feet maximum. Meter base mounted on exterior wall of house or mobile/manufactured homeįor overhead service, weather head must be a minimum of three feet above the roof.įor underground service, the poured footing must be notched out for the conduit.Ī disconnecting means must be provided for “all” mobile/manufactured home (ex. See below for our ASSEMBLY GUIDE FOR METER POLE INSTALLATION. If metallic weather head is used with PVC conduit, it must have a bonding ground. The pole must be treated and be at least a Class 7 round or 6”x 6” square and have a minimum of 14.5 feet above the ground. Weather head must be a minimum of 18 inches from top of the pole. See below for our ASSEMBLY GUIDE FOR METERBASE FOR UNDERGROUND SERVICE. See below for our GUIDE FOR METER BASE AND WEATHER HEAD INSTALLATION. The entrance cable must have at least 18 inches of excess wire left past the weather head to allow connection of the service wire. The bottom of the service conductor drip loop must be at least 12 feet above the ground. If a metallic bushing is used to connect the meter base to the switch box, it must be bonded with ground unless holes in the meter base and switch box were cut with a knockout kit.Ī conduit riser to the weather head must be sized to provide 40% or less fill as per NEC Code and structural strength to support service drop conductors. Meter base (furnished by Irwin EMC) must be located approximately 5 feet above the ground (4 feet minimum - 6 feet maximum).
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |